Rising Nexus Infra / Portfolio / Dholera

Dholera
Smart City

India's First Greenfield Smart City

At the intersection of government ambition and global capital stands Dholera — a 920 km² master-planned city rising from the ground up in Gujarat. As part of the Delhi-Mumbai Industrial Corridor, this is not a redevelopment. It is India building an entirely new city, and the investment window is now.

● Active Development ★ Airport Phase 1 — 2026 Gujarat, India DMIC Corridor Plots & Villas Available
920km²
Total Planned Area
22.5km²
Activation Zone Active
₹2.5LCr+
Committed Investments
10×
Land Value Growth (10 Yrs)
Infrastructure Actively Underway

Latest: Tata Electronics broke ground on India's first semiconductor fab at Dholera — a ₹91,000 crore facility with PM Modi laying the foundation stone.

Scroll
Dholera in 2025–26

What's Happening Right Now

December 2025

Airport Phase 1 Construction Complete

Dholera International Airport's Phase 1 construction reached completion in December 2025 as confirmed by the Ministry of Civil Aviation. The project — spanning 1,426 hectares near Navagam village — has moved into its licensing, calibration, and operational trial phase. Commercial passenger and cargo services are targeted to begin in 2026.

Aviation
2025

Tata Electronics Breaks Ground on ₹91,000 Cr Semiconductor Fab

In one of India's most significant industrial announcements in decades, Tata Electronics Private Limited commenced groundbreaking on its semiconductor fabrication facility at Dholera SIR. Prime Minister Narendra Modi laid the foundation stone virtually. The facility positions Dholera as India's first chip manufacturing hub. Trial production is expected from 2026.

Semiconductor • Manufacturing
2025

Customs Port Status & Global Investment Wave

Dholera Airport was officially declared a customs port in April 2025, enabling international cargo operations ahead of commercial launch. Simultaneously, Tokyo Electron opened a dedicated Dholera office, NextGen committed ₹8,800 crore for advanced chip manufacturing, Jabil committed ₹1,000 crore for silicon photonics, and INOX Air Products began construction of a ₹500 crore specialty gas hub.

Global Investments
2025

Expressway Operational & Solar at 1,200 MW

The Ahmedabad–Dholera Expressway — a 109 km access-controlled corridor — reached near-complete status, cutting road time from Ahmedabad to under 45 minutes. India's largest solar park within Dholera SIR simultaneously crossed 1,200 MW of commissioned capacity, with its 5,000 MW target powered by Tata Power.

Connectivity • Energy
2025

1,500 Residential Apartments Built for Industrial Workforce

To house the workforce arriving for the Tata semiconductor fab and surrounding industrial units, the state government has built 1,500 serviced apartments within Dholera SIR — with 275 already completed and occupied. This marks the transition from a development zone into a genuinely inhabited smart city.

Residential • Smart City
Ongoing

Land Values Up ~10× in a Decade

According to developers and market reports, land prices across Dholera SIR have risen approximately ten-fold over the past decade, with early Phase 1 investors recording returns of 200–300% since 2019. Analysts project 15–25% annual appreciation continuing through the infrastructure commissioning phase into 2027.

Market Intelligence
The Opportunity

Why Invest in
Dholera SIR?

Dholera SIR is not a residential project layered on top of existing urban sprawl. It is a designed-from-scratch city — roads, drainage, power grids, utilities, and metro — all installed before the population arrives. That sequencing is precisely what creates compounding investment value.

The key insight for investors: when infrastructure leads habitation, early land ownership produces extraordinary returns as the city fills around it. Dholera is already well past speculation — the Tata semiconductor fab, the operational expressway, the near-complete airport, and over ₹2.5 lakh crore in confirmed commitments make this one of India's most de-risked emerging market bets.

🏛️

Government-Backed at Every Level

Central and Gujarat state governments are active investors in Dholera's infrastructure, with ₹2 lakh crore+ committed through the DMIC framework. This is government-initiated development with private participation — not the other way around.

📈

Proven Land Appreciation

Land prices have grown approximately ten-fold in a decade. Early investors in the Phase 1 activation area have seen returns of 200–300% since 2019. With the airport, semiconductor fab, and expressway all converging, the next appreciation cycle is already underway.

🔌

Self-Sufficient Smart Infrastructure

Asia's largest solar park powers the city. Smart grids, underground wiring, treated water supply, and green building mandates are built into the development code. Dholera's infrastructure is a specification being built to contract — not a promise.

🌐

Global Industrial Endorsement

Tata Electronics, Tokyo Electron, NextGen, Jabil, Grew Energy, Mahindra Lifespaces, and Reliance are already committed. When global semiconductor and technology giants anchor their India manufacturing strategy to one location, the signal to investors is unambiguous.

Explore the Region

Dholera SIR — Interactive Map

Explore the key zones, infrastructure sites, and investment locations within and around Dholera Special Investment Region. Click any marker for details, or use the legend to fly to a specific location.

Map Layers
ABCD Building — Admin Core
Activation Zone headquarters
Dholera International Airport
Near Navagam • Phase 1 complete
Tata Semiconductor Fab
₹91,000 Cr • India's first chip fab
Solar Park (5,000 MW)
Asia's largest • 1,200 MW live
Residential & Plot Zones
TP4B2, TP5B • Active
Industrial Zone A
Manufacturing & logistics hub
Ahmedabad City
~45 min via Expressway
📍 Markers are approximate zone indicators based on publicly available planning data. Exact plot coordinates are provided during site consultation. Click any legend item to highlight on map.
What's Being Built

World-Class Infrastructure

Every major connectivity and utility system is either operational, in final commissioning, or under active construction. Dholera is not waiting for infrastructure — it is being defined by it.

✈️
Phase 1 Complete
2026
Commercial Ops Target

Dholera International Airport

Phase 1 construction of Dholera's international airport reached completion in December 2025. The airport — built near Navagam village, 80 km from Ahmedabad on a 1,426-hectare site — has been declared a customs port since April 2025. Calibration flights and systems trials are underway, with commercial passenger and cargo services targeted for 2026. The 3.2 km runway is capable of handling aircraft as large as the Airbus A380. Designed ultimately for 50 million passengers per year across phases, it is the logistical anchor for the Tata semiconductor fab and the wider industrial corridor.

Site Area
1,426 Hectares
Runway
3.2 km • A380 Capable
Phase 1 Capacity
1.2M Passengers / yr
Customs Port
Declared April 2025
Distance from SIR
~20 km
From Ahmedabad
~80 km • 45 min
🛣️

Ahmedabad–Dholera Expressway

A 109 km access-controlled expressway running directly from Ahmedabad to Dholera SIR — 98% complete as of 2025 and functionally operational across key stretches. Travel time drops to under 45 minutes, fundamentally changing the city's market access.

Operational
☀️

Asia's Largest Solar Park

A 5,000 MW solar installation — Asia's largest — being developed within the SIR by Tata Power. Phase I of 1,000 MW has been commissioned, with 1,200 MW total already live as of 2025. Powers the industrial zones with clean, cost-effective energy that global manufacturers increasingly demand.

1,200 MW Live
🚇

Metro Rail — MRTS

A Mass Rapid Transit System designed within the SIR's central road-of-way, connecting the activation zone to residential, industrial, and airport precincts. Forms a critical part of Dholera's zero-dependency-on-cars smart mobility vision.

Planned • In ROW
🚂

Dedicated Freight Corridor Link

The Bhimnath–Dholera freight railway line connects the city directly to India's Western Dedicated Freight Corridor — providing uninterrupted rail access to major ports and manufacturing hubs essential for just-in-time semiconductor logistics.

DFC Connected
🏭

Smart Utilities & ABCD Building

Dholera's administrative and civic core — the ABCD Building — is operational. Smart grids, 24/7 treated water supply, underground wiring, and an intelligent command centre monitoring water, power, waste, and traffic in real time.

Operational
Investment Options

Where to Invest in Dholera

920km²
Total SIR Area
144–300
Plot Sizes (sq.yd.)
₹15L+
Entry Investment
15–25%
Projected Annual Appreciation

Residential Plots

Active

NA-converted residential plots within the activation zone — the most liquid and consistently appreciated asset class in Dholera. Early investors here have seen 200–300% returns since 2019. With the expressway operational and the airport approaching commercial launch, the next demand wave has already begun.

Plot Size
144 – 300 sq.yd.
Type
NA Residential
Zone
Activation Area
Entry Price
₹72 Lakhs

Villas & Township Communities

Active

Integrated township developments — plots and villas within gated, master-planned communities with built-in amenities. With 275 serviced apartments for the semiconductor workforce already occupied and 1,500 total units underway, the residential city within Dholera is taking real shape.

Offering
Plots & Villas
Type
Gated • Township
Amenities
Master Planned
Price
₹ 40 Lack

Commercial & Mixed-Use

Active

Commercial plots within and adjacent to the activation zone — business parks, service retail, hospitality, and mixed-use developments catering to the growing industrial workforce and investor community. Demand is actively rising with the acceleration of the semiconductor and solar ecosystem.

Use
Commercial • Mixed
Investor Type
HNI • Institutional
Zone
Business District • Near Ariport
Size
178 – 2462 sq.yd.
Price
From ₹ 50 lack

Industrial & Logistics Parcels

Active

Industrial land within Zone A — the preferred zone for manufacturing, warehousing, and logistics operations. With the Tata fab under construction, INOX Air Products building its gas hub, and Grew Energy erecting solar component manufacturing, the industrial zone is no longer speculative. It is operational.

Use
Industrial • Warehouse
Access
DFC • Expressway
Power
Solar Grid 1,200 MW
Price
Request for price
Size
10,000 sq. yd.
Market Validation

Who Has Already Committed

The roster of organisations that have moved capital into Dholera SIR is perhaps the clearest indicator of its credibility. When India's largest conglomerate, global semiconductor equipment leaders, and renewable energy giants choose the same location — it removes ambiguity for every other investor who follows.

🔬
Tata Electronics
Semiconductor Manufacturing

Groundbreaking with PM Modi. India's first semiconductor fab — advanced chip production lines and tech labs for domestic and global markets. Trial production expected 2026.

₹91,000 Crore committed
Tata Power
Renewable Energy

Developing Asia's largest solar park at 5,000 MW within Dholera SIR. With 1,200 MW already live, Tata Power's presence makes the city's clean energy credentials among the most credible of any industrial zone in Asia.

5,000 MW Solar Park
💨
INOX Air Products
Industrial Gases • Semiconductor Support

Construction underway on a ₹500 crore electronic specialty gas hub producing ultra-high purity nitrogen, oxygen, argon, and hydrogen — essential supply-chain infrastructure for chip fabrication.

₹500 Crore • Under Construction
💡
NextGen Semiconductor
Advanced Electronics

A major commitment to build an advanced semiconductor and optoelectronics manufacturing plant — producing high-end components for domestic consumption and export, deepening Dholera's chip-making ecosystem.

₹8,800 Crore committed
🔆
Grew Energy
Solar Components Manufacturing

Building a large-scale solar panels and module manufacturing unit — contributing to India's push for domestic solar equipment production and reducing dependence on imported renewable energy components.

₹3,800 Crore committed
🌏
Tokyo Electron
Semiconductor Equipment • Japan

The Japanese semiconductor equipment giant opened a dedicated Dholera office in 2025. Their physical presence signals confidence at the highest levels of the global chip supply chain.

Dedicated Dholera Office • 2025
💻
Jabil India
Silicon Photonics

A global manufacturing services company establishing a silicon photonics manufacturing unit — introducing cutting-edge optical semiconductor technology and expanding India's advanced electronics capability.

₹1,000 Crore committed
🔩
L&T (Larsen & Toubro)
Engineering • EPC • Infrastructure

India's premier engineering and construction firm is the execution backbone for Dholera's civic infrastructure — town planning, sewage treatment, and utility systems. Their involvement is a quality assurance signal for the entire development.

Civic Infrastructure EPC
🏘️
Mahindra Lifespaces
Urban Development • Real Estate

Developing core city zones with a focus on sustainable, integrated urban planning. Mahindra Lifespaces brings institutional-grade residential and commercial development — raising the quality bar for the overall city ecosystem.

Core Zone Development
Also In Active Discussions or Exploration
Reliance Industries — Data Centres & Green Energy Adani Group — Logistics Parks & Infrastructure NEC Corporation (Japan) — Smart City ICT Wipro — IT Development Centre Tech Mahindra — Technology Campus ReNew Power — Renewable Manufacturing Vedanta Group — Industrial Operations Tsingshan Group — Steel & EV Battery Plant
Our Edge

The Rising Nexus Advantage

Choosing Rising Nexus Infra as your Dholera partner means accessing a decade of on-ground intelligence — not just the general case for the city, but the specific knowledge of zones, developers, and timing that separates a good investment from a great one.

📍

In Dholera Since 2014

Our real estate leadership has been active in India's investment corridors since 2014 — long before Dholera became a headline. That history means we understand which zones to target, which developers to trust, and which plots carry the best risk-adjusted appreciation profile for our clients.

🤝

Developer & Authority Relationships

We engage directly with project developers, land authorities, and planning bodies in Dholera — not as a reseller, but as a trusted transaction partner. This gives our clients access to pre-launch inventory, accurate documentation review, and the kind of deal access that does not come from a brochure.

🌐

International Investor Access

Through our network spanning India, Dubai, and beyond — including high-net-worth individuals and investment communities across markets — we bring Dholera's opportunity to a global investor base. NRIs, UAE-based investors, and international buyers are increasingly active in Dholera, and we are their most direct route in.

🧠

Full-Cycle Advisory

From the first conversation about suitability, through documentation, site visits, legal checks, investment structuring, and post-purchase support — our team is present at every stage. We treat each client's capital as if it were our own, because our reputation is built entirely on outcomes, not transactions.

Get Started

Let's Talk About Dholera

Fill in your details and our Dholera specialist will reach out personally within 24 hours.

✓ Received. Our Dholera specialist will be in touch within 24 hours.